Work orders are the gears that drive the entire system: they put all the information already entered in Aragro to use.

There are different types of work orders, linked to the activity categories in Aragro. This guide focuses on the anatomy of a work order—that is, the sections it may contain. The sections change depending on the type of work order.

When you create a work order for an activity, Aragro asks for the sections specific to that activity or task, such as whether it requires machinery or inputs.

To create a work order, click “Create new.”

Next, fill in the following fields:

  • In Activity, select the desired activity. If the selected activity tracks the number of applications, the Application # option is enabled beside the activity so you can enter its application number in the work order.
  • In Document date, select the date and, optionally, the time. The time is optional, but the date is required.
  • Crop cycle shows cycles created previously. You can also create a crop cycle from “+ New crop cycle” in the drop-down menu.
  • Zone is optional if your farm is divided into zones.
  • Internal ID is optional; you can assign one to the work order. The platform generates an ID for every work order, and you can also assign an internal ID as needed.
  • Record progress by is optional and can be set according to how you want to record progress on the work order.
  • Assign to is optional. It creates a work order for a specific user as if that user had created it.
Initial order details: activity and application, crop cycle, date and time, zone, internal ID, progress tracking, and user assignment.

Each work order has sections enabled according to the selected activity. A work order may contain the following sections.

Open plot selector with plots grouped by development or production status and an Add button.
  • Select one or more plots where the activity in this work order will be performed.
  • After selecting the plots, click “+ Add.”
Three plots selected in the field, ready to be added to the order with Add.
Plots added and checked in the table, with the selection menu open and Remove available.
* If needed, this section is 100% editable, as shown in the image above.
Worker selector with groups, individual employees, and an option to enter a total without names.

Workers can be added to a work order in several ways:

  1. By employee name.
  2. By group.
  3. By number of employees.
  4. By job position.

Select the workers who will be part of the work order, then click “+ Add.”

Workers added to the order, with employee, salary, and attendance columns.

If you have temporary or contract workers, you can enter the total number of workers who will perform the activity and the labor cost without recording their names:

  • In Workers, select “Enter total number of workers instead of individual names,” as shown below.
Enter total number of workers instead of individual names appears at the top of the worker selector.
  • Then enter Total workers and the Salary per worker. Aragro automatically calculates Labor cost. For example:
Entry by worker count: total workers, salary per workday, and calculated labor cost.
Fleet and machinery section before equipment is added, with a machine selector and implement, operator, and hour meter columns.

In this section, select the machinery to use in the work order, then click “+ Add.”

Open machinery selector with equipment grouped by type and a pickup truck selected before clicking Add.

If the machinery requires a driver or operator, that employee must be included in the employee list. For example, the employee “Jose Daniel Martinez” has the job position “Driver,” which is why he appears as “Operator” in the drop-down list.

Employee selector in the added machine's Operator column, with a driver available to assign.
* If machinery requires an operator and one is not assigned in the work order, you will not be able to enter the work order in the system.
Input search showing each product's available balance, with zero balances highlighted in red.

In this section, select the inputs to be used for the activity in the work order. Aragro shows the available balances recorded in the system.

After selecting one or more products, click “+ Add.”

Once a product has been added to the work order, you can change its dose and the corresponding unit of measure, adjust its total as needed, and set the quantity of input to be used on each plot if the activity covers multiple plots, as shown below.

Added input with editable dose and unit, total requested, and expanded dose details by plot.
Add new comment area with a drag-and-drop zone for file attachments.

In this section, you can add comments and attach any files from your computer, if needed.

As a final step, after entering all the necessary information in the work order, click “Start work order.”

This action changes the work order’s status. A work order can have different statuses:

  • Draft: The initial status. You can cancel the work order while it is in this status.
  • In progress: The work order has started. Here you enter what actually happened in the field once the activity has been performed or completed. You can cancel the work order while it is in this status.
  • Completed: The work order is complete and contains the actual progress information. You cannot cancel it in this status; you can only reverse it.

The work order status appears in the upper-right corner, as shown below:

In progress status at the upper-right corner of the work order.

To complete a work order, update the sections you filled in earlier, as shown below.

Attendance table for completing the order, with attendance, hours, and overtime fields for each worker and totals at the bottom.
  • Mark whether the worker attended their work shift.
  • Enter the hours the worker spent on the activity.
  • If needed, enter each worker’s overtime hours.
Machinery use and machine hours: equipment with an assigned operator and an Hours field for recording usage time.

If applicable, enter the Hour meter and Odometer readings for the machinery listed in the work order.

Worker and machine hours distributed across plots, with editable fields, percentages, and hours still to allocate.

Enter information in the columns whose fields can be edited. In this example, these are:

  • Hour distribution (Dist. Horas)
  • Machine-hour distribution (Dist Horas Maq)
Input consumption with an automatic or manual allocation menu and an editable Remaining field beside the consumed and requested quantities.

This section is important because it lets you allocate the inputs used in the field automatically or manually. You can distribute consumption evenly across plots, or allocate it manually to track actual consumption on each plot in more detail.

Update the Remaining column with the correct information; otherwise, continue to the next step.

Finally, when you have finished entering the information, click “Complete work order.”

You can reverse a work order if necessary. This cancels the activity, and any inputs listed in the work order are returned to their original location.

To correct a completed order (revert and duplicate), see Correct a completed work order, purchase or payroll.

Open work order Actions menu with Reverse below Duplicate order.

If needed, you can get a physical copy of the work order by selecting “Download field report.” This creates a PDF with all the information in the work order so you can handle or store it outside Aragro.