Frequent questions about measuring work and harvest. Basic setup is in [Units of measure](/en/units-of-measure/).

<details class="faq">
<summary><h2 id="how-do-i-create-a-unit-like-box-can-or-basket">How do I create a unit like box, can or basket?</h2></summary>

<p>Create it in <strong>Administration → Units of measure</strong> with its <strong>conversion factor</strong> to a base weight unit. For example, *can* = 22 kg, *basket* = 22.7 kg, *box* ≈ 1.1 quintals ≈ 49.9 kg. With the conversion, reports can add up harvests recorded in different units.</p>

</details>

<details class="faq">
<summary><h2 id="which-unit-should-i-use-to-measure-an-activitys-progress">Which unit should I use to measure an activity's progress?</h2></summary>

<p>The unit that best shows the work done, not hours: <strong>barrels</strong> for spraying, <strong>pounds</strong> for fertilizing, <strong>quintals</strong> for harvest, <strong>hectares</strong> for weeding. That lets you calculate efficiency (for example, barrels per worker-day) and pay piecework. See <a href="/en/pay-rules/">Pay rules</a>.</p>

</details>

<details class="faq">
<summary><h2 id="can-i-change-my-farms-area-unit">Can I change my farm's area unit?</h2></summary>

<p>Yes, but do it <strong>before creating activities</strong>. Once activities exist, the change is blocked.</p>

</details>

<details class="faq">
<summary><h2 id="how-do-i-record-several-applications-of-the-same-task-in-one-cycle">How do I record several applications of the same task in one cycle?</h2></summary>

<p>Turn on <strong>Measure application number</strong> in the activity. You can then record *Herbicide 1*, *Herbicide 2*… without creating an activity per application, see each one's progress and cost per field on the map, and plan them separately.</p>

</details>

<details class="faq">
<summary><h2 id="what-are-an-activitys-metrics-for">What are an activity's metrics for?</h2></summary>

<p>To record <strong>quality or categories</strong> within the same activity (for example, *first-grade strawberry* and *second-grade strawberry*, or *Green Q80* and *Green Q70*). They feed quality reports and let you pay different rates without duplicating activities.</p>

</details>

<details class="faq">
<summary><h2 id="how-many-decimals-does-progress-accept">How many decimals does progress accept?</h2></summary>

<p>Aragro stores progress with more than two decimals so piecework pay is exact. If you see rounding that doesn't match your payroll, write to us with the work order number.</p>

</details>

If you have a question this page does not answer, contact us in the Aragro chat or write to [hola@aragro.com](mailto:hola@aragro.com).