﻿# Metrics

> How to create performance metrics and use them in your Aragro activities.

Source: https://resources.aragro.com/en/metrics/
Language: en

Relative links and media resolve against the source URL.

> **Availability:** In the standard configuration, these features are included starting with the **Growth** plan. Access also depends on the features enabled in your account and on your role's permissions. [Compare plans](https://aragro.com/en/pricing).

Every crop has its own particularities, and we want to make sure you can see the progress of your activities, especially when they are measured in a specific way.

## What measuring progress means

In Aragro, measuring progress means recording the amount of work completed in a work order: for example, area covered during spraying, plants planted, or meters of road repaired.

In this module, you can create your own performance metrics for the company.

## Create a metric

From [the Metrics section in Aragro](https://app.aragro.com/agro/metrics), you can see all the preloaded metrics. If the metric you need is not on the list, you can create it.

Use the **“+ Create new”** button. A form will open on the right side of the screen.

<figure>
  <img src="/wp-content/uploads/sites/2/2025/07/Screen-Shot-2025-07-30-at-15.57.16.png" alt="Form for creating a new metric in Aragro" loading="lazy" decoding="async" />
  <figcaption>Form for creating a custom metric.</figcaption>
</figure>

Don’t forget to refresh your browser page after saving the changes.

## Use the metric in an activity

Once the metric has been created, go to the activity where you want to measure progress.

Inside the activity, edit the **Metrics** section. Select the unit for measuring progress and then choose the metric you need from the dropdown indicated by the blue arrow. Don’t forget to click **“+ Add”**.

<figure>
  <img src="/wp-content/uploads/sites/2/2025/07/Screen-Shot-2025-07-30-at-16.04.00.png" alt="Metrics section of an activity, with the selector and Add button" loading="lazy" decoding="async" />
  <figcaption>Progress measurement settings inside an activity.</figcaption>
</figure>

Once that’s done, save the activity changes in the bottom-right corner of the screen.

<div class="resources-next-step">
  <strong>Next step</strong><br />
  When you’re done, read the <a href="/en/create-an-agricultural-activity/">activities guide</a> to connect the metric to your workflow.
</div>
